日期研发支出项目数单个项目分RD10量摊数RD11RD12气动式XX的研制B3,933.953,769.293,230.823,230.822,826.96单台PLCXXX一种光感XX的研制设备B1月2月3月4月5月6月7月8月9月10月11月12月23,603.7122,615.7122,615.7122,615.7122,615.7122,615.7122,615.7122,557.1322,303.4522,232.5521,298.6122,232.5566778666663,933.953,769.293,230.823,230.822,826.963,769.293,769.293,759.523,717.243,705.434,259.725,558.143,933.953,769.293,230.823,230.822,826.963,769.293,769.293,759.523,717.243,705.434,259.725,558.1445,530.47B3,933.953,769.293,230.823,230.822,826.963,769.293,769.293,759.523,717.243,705.434,259.725,558.1445,530.472011.5-2012.122011.1-2012.122010.5-2012.5合计:269,922.2716,991.84RD14小线径XXX的研制A3,933.953,769.283,230.823,230.822,826.96RD15RD16RD17带自动补偿XX系统的研发ARD18智能XXX的研制A合计波簧成型XX研XXX控制技术制研发B3,933.953,769.283,230.813,230.812,826.963,769.293,769.293,759.523,717.243,705.434,259.72B3,933.963,769.283,230.813,230.812,826.973,769.283,769.283,759.523,717.243,705.422010.11-2012.52011.2-2012.112010.4-2012.102012.3-2013.92012.5-2013.1023,603.7122,615.713,230.813,230.812,826.973,769.283,769.283,759.523,717.243,705.424,259.725,558.142,826.973,769.283,769.283,759.533,717.253,705.424,259.735,558.1331,365.5922,615.7122,615.7122,615.7122,615.7122,615.7122,557.1322,303.4522,232.5521,298.6122,232.55269,922.2616,991.8339,972.3035,712.5737,827.19