工程名称:亭心安置小区8#楼桩基 标段:
综 合 单 价 组 成(元)序号项目编码项目名称单位工程量人工费2.46材料费119.93机械费14.83管理费2.25利润1.21单价合价预制钢筋混凝土桩010201001001静力压预制钢筋砼离心管桩长20m(PC-400-A-95-20)2-21静力压预制钢筋砼离心管桩长在24m以内1m4000.000140.68562720.002m3363.92727.101318.15163.0124.7113.311546.28562732.273预制钢筋混凝土桩010201001002静力压预制钢筋砼离心送桩长在24m以内2-23静力压预制钢筋砼离心送桩长在24m以内m344.0002.731.6015.502.371.2823.488077.124567891011m3个个31.298200.000200.00030.0017.5464.5364.53170.4215.3715.3726.052.002.0014.031.081.08258.0482.9882.9865538.368076.1416596.0016596.0065538.3665538.3665538.3610575.0010204.80接桩010201002001电焊接桩螺栓+电焊2-27备注2电焊接桩螺栓+电焊A.1打桩预制钢筋混凝土桩010201001003柴油发电机组320kWJ10008柴油发电机组320kW台班台班27.85527.8551960.701960.70254.89254.89137.25137.252352.842352.8410575.00A.2试桩预制钢筋混凝土桩010201001004静力压预制钢筋砼离心管桩长20m(PC-400-A-95-20)2-22静力压预制钢筋砼离心管桩长在24m以上m60.0003.88119.8637.975.442.93170.0812m35.45642.601318.15417.6659.8332.221870.4610205.2313预制钢筋混凝土桩010201001005静力压预制钢筋砼离心送桩长在24m以内2-23静力压预制钢筋砼离心送桩长在24m以内m5.1602.731.6015.522.371.2823.50121.261415m3个0.4703.00030.0017.5464.53170.4215.3726.052.0014.031.08258.0482.98121.28248.94接桩010201002002电焊接桩螺栓+电焊分部分项工程费分析表
工程名称:亭心安置小区8#楼桩基 标段:
综 合 单 价 组 成(元)序号16项目编码2-27备注2项目名称电焊接桩螺栓+电焊【合计】单位个工程量3.000人工费材料费64.53机械费15.37管理费2.00利润1.08单价82.98合价248.94663518.21【新点2008清单造价江苏版 V9.2.07】
因篇幅问题不能全部显示,请点此查看更多更全内容